I have similar issues, but it happens most often with my kitchen after I installed an Iron oven. Some modules will occasionally decide that they refuse to be moved, or that they have married another module. In the latter case, if I attempt to move a module up past the loving pair of modules, it will jump up two places, and the same going down, and this appears consistent regardless of position and which modules are moved past the pair.
Okay, I've been looking for repro steps for this and nobody can give me any. If this is happening, can you provide: - save - console - replay file (it's hidden in Gaslamp Games\Clockwork Empires\save\replay - look for the one with the right timestamp) and upload them here? Thanks!
I shall remember this next time I play and observe it happening. Could you enlighten me what exactly you mean by "console" though?
You should be able to produce the jumpy behaviour bug by building a ceramics workbench in the above save and install it into the ceramics workshop (i build it at the left most position as seen from the door). The attached save already show the bug that moving the modules is somewhat strange
This is so weird. I'm trying to figure this out and these are some leads, but.. man, this is so weird. Thanks!
I have a feeling that demolishing modules and then installing modules leads to the bug, since my kitchen started to behave funny, too after demolishing two old stone ovens and building iron ovens
Yeah, I've had this happen in the carpentry shop, ceramics shop and kitchen. It started after demolishing a module and building something else.